Renewal underway in Hautes-de-France

3 Suite Rapide’s sites at Lille
Suite Rapide at work in the Northern region, in Hautes-de-France, where SNCF will fully and “rapidly” restore 3 railway sections that branch out in the chief town of Lille.
Suite Rapide at work in the Northern region, in Hautes-de-France, where SNCF will fully and “rapidly” restore 3 railway sections that branch out in the chief town of Lille.
The preliminary phases for Suite Rapide site have begun in Normandy, that has the purpose to restore by May, an additional 60 km of line 340 000 Paris Saint Lazare - Le Havre between Motteville and St. Pierre du Vauvray. A site that will combine the usual production efficiency with extra efforts to respect the environment and recycle the outdated line components.
First electrified train along 27 km of the Reggio Emilia - Ciano d’Enza section. The event scheduled for Sunday, January 23rd, will open the testing phase of the railway electrified by GCF and will mark, above all, the first, tangible step towards the “ecological transition”, one of the three axes on which Emilia Romagna Region founded its powerful Sustainable Plan of the railway network.