In the period January 2006-April 2013, GCF - Generale Costruzioni Ferroviarie carried out for client ITALFERR the executive design and implementation work for electric traction and superstructures, as well as P.R.G. civil works, for Venice-Mestre Station, including the ET cabin and lighting and drive power systems, performed in functional stages linked with the new A.C.S. system.
Electrification works
Electric traction in the scope of station gantries: new poles, crossbeams, anchors and insulators on poles, gantries and crossbeams, ET protection and return circuit, new 3 Kv and 10 Kv power catenary lines;
Construction of an ET cabin: supply and installation of cabin electrical equipment, supervision, control and diagnostics systems, ASDE servos and remote control;
Illumination and Drive Power: electrical cabins, plant, installation of power lines, ducts, connections and wiring, electrical control panels, transformers, lighting towers, floodlights, earth/ground and equipotential system.
Superstructure works
Demolitions, extensions and adaptations of railbeds, construction of new railway lines, line doubling, modification of station tracks and connection areas, communications projects.