Skip to main content

Milan M1

Signalling: Milan Metro, Line 1

Signalling: Milan Metro, Line 1

Turnkey design and supply of the equipment needed to install the new signalling and automation system on Milan Metro Line 1.

The signalling system was completely renovated following work on all ACEI cabins to prepare plant for the new signalling system. All installations in tunnels (cable laying, installation of signals, fitting antennae, etc.) were also renewed.

Rolling stock was also modified in order to implement the new ATC (Automatic Train Control) - an automatic locking system for spacing and train drive protection.

Customer: ATM S.p.A. Work performed in a Temporary Business Association with Alstom.

 

Segnalamento Metro Milano M1