Executive design and execution of all works, tasks, services and supplies related to and in any case necessary for the redevelopment of the Saronno-Seregno line.
The integrated project involved design and installation of the following plant:
Signalling system: installation and construction of all depot entities (signals, points, etc.) and supply of a Central Multi-Station Box system including Operator Position and Diagnostic Position;
Lighting and drive power plant: inside stations for lighting and control of Level Crossings, lighting of walkways along tracks, lift plant, etc.;
Electric traction: construction of blocks, installation of poles and overhead wiring of power contact lines;
Telecommunications system: installation of telephones, laying of telephone cables and fibre optic cables.
Tender contract awarded by Ferrovie Nord Milano S.p.A. Works performed in a Temporary Business Association with Salcef.