IS Plant Lecce-Fasano line

IS Plant Lecce-Fasano line

IS Plant Lecce-Fasano line

Executive design and execution of construction works for IS Plant, Civil Works, Lighting and Drive Power Plant, Superstructures and Electric Traction to equip the Fasano-Lecce line with a Centralised Traffic control system (CTC).

The integrated tender contract involved works for:

  • construction of new ACEI systems with the V401 layout (base signalling layout adopted) for Fasano, Ostuni, San Vito dei Normanni, Brindisi, Squinzano and Surbo stations;
  • modifications to ACEI systems in Lecce for adaptation to Permanent Door Station;
  • construction of new buildings for the installation of new ACEI systems and technological equipment, in stations at: Fasano, Ostuni, PBI 736, PLA 745, San Vito dei Normanni, Brindisi and Squinzano;
  • renovation of premises suitable for housing technological equipment in stations at: Cisternino, Carovigno, Serranova, San Vito dei Normanni, Restinco, San Pietro Venotico, Trepuzzi, Surbo and Lecce;
  • work to modify railway superstructure plant and the electric traction system.

Tender contract awarded by ITALFERR S.p.A. Works carried out in a Temporary Business Association with Ceit, Comesvil, Fersalento.

 

Lecce Fasano GCF Segnalamento