Design and construction of ACEI plant and TLC telecommunications plant in the goods yard at Villa Selva (Bologna-Rimini line).
Tender activities included the design and execution of a remote-controlled ACEI system with manoeuvring signalling conforming to layout I/016II series according to V401 layout principles.
Cabin works involved the supply and installation of metal cabinets to contain cabin equipment, the installation of an electronic station event chronological recorder, manoeuvring system complete with all system control organs, illuminated control panel with modular inserts and everything else needed for cabin operations.
Depot work involved the installation of the main and secondary ducts, cable laying, installation of poles and signals, installation of telephones and complementary works.