Site map
- 2015
- 2016
- Rossi Group implements the new Andora-San Lorenzo line
- GCF railway superstructures for the Brescia-Treviglio line
- Rossfin (GCF and GEFER) ranking 15th among Italian construction companies
- Renewal work on the Brescia-Edolo railway line
- Italy-Bulgaria: friendly match for railway construction
- Sarajevo-Bradina: ribbon cutting ceremony drawing nearer
- GCF and railway superstructures: action for the environment
- Aarhus: city rails
- GCF - one of the Top Ten Italian “builders”
- The "Ivan" tunnel is to be restored soon
- Italy: railway maintenance and renewal expanding
- GCF wins Danish contract for "S-tog” renewal work
- GCF: “Railway safety is an imperative”
- GCF Omnia Support Structure at InnoTrans in Berlin
- Ance 2016: railway construction in great demand abroad
- 2017
- GCF Convention: profile of a Group in expansion
- ANCE 2017: GCF ranked 15th
- GCF with the top companies at Expoferroviaria 2017
- Rabat-Agdal runs on GCF rails
- GCF at the International Exhibition for Track Technology
- Bulgaria opens the Plovdiv-Burgas line
- Omnia cantilevers for the Bologna-Milan line
- An innovative maintenance area for NTV trains in Mestre
- GCF Electrification: overhead wiring doubled, costs halved.
- Ceneri Base Tunnel
- Suite Rapide
- 2018
- Venice-Mestre: Installation of the new gantries has been completed
- GCF celebrates High Speed with Morocco
- Dynamic track load weighing gets smart
- High-speed GCF - and not only with trains…
- Ance 2018: Made in Italy continues to grow
- Berlin: the world showcase for railways
- InnoTrans: the future of transport under the global spotlight
- Innovative overhead contact line on the Mestre - Venezia S. Lucia railway line
- Rigid catenary for the new Lavis underground station
- The RFI railway workshop is now fully operational
- A mobile lathe for GCF's rolling stock
- From the sites
- Suite Rapide moves closer to its goal with its two C5 work sites
- Track renewal in Suite Rapide: GCF hits the 1,000 mark
- New trains and machinery for the French Suite Rapide
- The Cityringen Metro, a milestone achievement draws nearer
- Gold blocks for the Monte Ceneri Base Tunnel
- Monte Ceneri Tunnel: the first of the two bores has been delivered.
- GCF Suite Rapide: work gets under way in Rhône-Alpes
- Suite Rapide and Lots 1 and 2 for GCF in France
- Aarhus uses GCF tracks for the first time
- 2019
- GCF 11th in the TOP 50 Builders classification
- In Veneto, a multi construction site for sustainability
- Expo Ferroviaria. GCF’s advance solutions
- At Expo ferroviaria 2019, with the top sector’s companies
- Functionality and aesthetics for the new Liberty Bridge
- In Lausanne, GCF’s tracks and catenary for LEB
- GCF’s rigid catenary will be the “standard”
- A Grizzly for the safety of tracks
- “Proud to have helped RFI in Genoa”
- Research and Innovation, GCF future
- From Sites
- Suite Rapide, towards aim 400
- The restoring of railway Rail Route 10 has started in Kosovo
- Railway renewal 2019: over 250 km in 8 months
- Suite Rapide: a construction site in images
- Suite Rapide’s summer construction site begins in Amiens
- Suite Rapide, C2-L3 towards the conclusionSuite Rapide
- “Suite Rapide” also captures Aquitania.
- New foreign office of GCF
- In Nantes, two GCF-Transalp’s Suite Rapide trains
- Kosovo sets out to modernize its railway network with GCF
- 2020
- GCF is confirmed leader of the railway sector
- The confor railway engineerstest has been launched
- Alta Onorificenza di Bilancio award for GCF
- GCF deepens its roots in France
- With industry 4.0, GCF’s fleet becomes Smart
- Executive project to upgrade the Latina-Formia line
- GCF at work for cabling in optic fiber
- GCF and Gefer are restarting at full pace
- Covid-19: a new ward at Gemelli Hospital
- Covid-19: “Gemelli” says Thank You
- Coronavirus emergency, the solidarity of Rossi Group
- Safer railways with REDI
- From Sites
- 2021
- Rossi Group ranking among the top Italian builders
- The master for railway engineers is now taking subscriptions
- With Gefer, the lathe reaches the train
- Last generation technologies for the Florence Node
- GCF acquires Platinum Track Service Inc.
- Safe together
- 3 stars to Generale Costruzioni Ferroviarie
- 4th Italian-French forum of Family Enterprises
- GCF acquires the historical Cenedese S.p.A
- Electrified line and Green trains for Venice-Belluno line
- A new GCF’s sub-station for Guastalla - Reggio Emilia
- Conegliano - Belluno: electrification completed
- Columbus Covid 2 Hospital: 12 months fighting Covid
- From Sites
- Kosovo: Infrakos and GCF seal a contract
- Kosovo: GCF awarded also the second lot of Rail Route 10
- Suite Rapide opens the sixth site in new Aquitania
- SNCF: a video to celebrate the challenge won in Allier
- Paris - Le Havre line under renovations
- New outstanding addition for GCF’s machine fleet
- Renewal works by Suite Rapide at night
- The fourth Suite Rapide Suite of 2021 has just been launched in Northern France
- Suite Rapide at full speed in 2021
- 2022
- Work underway on Latina-Formia upgrade
- Kosovo: works have begun for Lot 2
- Rossi Group ranks 8th in the Builders’ TOP 200
- Rocchetta-Potenza: electrification is coming soon
- Neurail – MOCV debut at Innotrans
- GCF in Toulouse for Metro B extension
- Lausanne inaugurates the LEB gallery
- Safer with COGI
- GCF in Münster, for the 28th IAF
- From Sites
- 2023
- Top 200 Builders: GCF Confirms the 8th position
- Felix Industry: GCF in the Roll of Honor 2023
- Sir2 in Padua at the starting line
- G.C.F. Strengthens Corporate Governance
- GCF strengthens foothold in North America
- "Cassa Edile Awards," an award for the virtuous
- Rome-Naples: upgrades toward completion
- New PRG for Trieste Campo Marzio
- Val di Riga, railway variant to go.
- Andria-Barletta, doubling in sight
- Salerno Metro, GCF's tracks.
- GCF at work on the T2 tramway line
- New machines for GCF's construction sites
- Railway renovation thrills the news
- GCF acquires PAI-PL branch from PSC Group
- GCF: the employee at the centre
- Master's degree for engineers: registration open
- From Sites
- 2024
- Master in Engineering Opens Applications
- The innovative "Stop" at SEF 24
- In Matera by Metro with the new CTC
- GCF and the "Iron Way" in Trieste
- GCF in Berlin Showcasing the Best of Innovation
- Safety as a Culture
- GCF: not just railways
- Master Engineers, Internships Started
- Two Days in the Senate for Safety Culture
- “STOP”: safer construction sites with AI
- Protagonists of safety at LC
- With radar, safe level crossings on Bari-Taranto
- Industria FELIX awards GCF
- Master Engineers 2024 kicks off
- From Sites
- Opening of the Suite Rapide site in Château-Thierry
- Double GCF construction site in France
- Rocchetta - Potenza, construction sites in operation
- Suite Rapide to complete the Chartres - Le Mans
- Rejuvenates the historic "watchmakers' line"
- Suite Rapide 2024: start in Limoges
- 11 years in Suite Rapide for France
- 2025
- GCF confirmed among the “Excellences”
- GCF Solutions at Saudi Rail 2025
- GCF, a Champion of Sustainability
- New railway site in Besançon for GCF France
- Railway Safety looks to “Futuro”
- GCF at work for the Toulouse Metro Line B
- In Münster with GCF for the 29th IAF
- GCF at High Speed Towards Marrakech
- Successful Verification for GCF’s PAI-PL
- From Site
- 2026
- GCF in Berlin with the best of the railway industry
- Ponte al Pino: 550-ton bridge launched
- From Construction Sites to Research: GCF at the Forefront of Railway Innovation
- Padua SIR2: Precision and Innovation for Lot 2
- GCF Research to Be Presented at the 9WCSCM
- T2 Bergamo–Villa d'Almè: Towards Completion
- Val Venosta Railway enters the electric era
- GCF Group company expands into Germany
- Renewal and Rehabilitation Worksites with GCF
- RFI Approval for GCF’s PAI-PL System
- Canada: Track Maintenance Awarded to a GCF Group Company
- STOP: enhanced safety on GCF and GEFER worksites
- Val Pusteria, renewed railway inaugurated
- Toulouse Metro Line B: GCF at Work
- Master’s Degree for Railway Engineers: Applications Now Open
- From Site
- Machinery
- Work trains and track laying
- Re-laying Trains
- Tamping machines
- Stabilizers
- Welding machines
- Profiling machines
- Electrification and Signalling
- Road-rail vehicles
- Maintenance
- other systems
- Company
- GCF Certificazioni
- Gefer, Ethic certification SA8000
- History of the Group
- GCF Ethic certification SA8000
- Rossfin Group Companies
- The Group
- Management
- Key Figures and Competitive Advantages
- Sustainability report
- Whistleblowing
- Responsibility Policies
- Code of Ethics
- Group Quality and Certifications
- The group’s offices
- References
- GCF: our History
- GCF: a Point of Reference
- GCF Group
- Business unit
- Civil Works
- GCF Production Divisions
- Railway Superstructures: Construction
- Railway superstructures: Renewal
- Railway superstructures: Maintenance
- Urban transport, metro and tram
- Electrification: Catenary construction
- Signalling: plant and cabins
- PAI-PL, technology at the service of security
- High-voltage
- Gefer: machinery maintenance workshop
- The Neurail System: predictive diagnostic Analysis
- NeuRAIL: COGI, Optical Insulated-Joint Monitoring
- NeuRAIL: MOCV, optical Vertical-Load Measurement
- Redi: the electronic disk relay
- Omnia: a single System Cantilever for all lines
- Progetti
- Olmata Tunnel Upgrade
- Passo Corese Railway Bridge Replacement
- Overpass Replacement - Florence Railway Junction
- Sistemi LCP
- Electrical Substations
- Signalling: other projects
- ACEI Villaselva
- IS Plant Lecce-Fasano line
- Saronno-Seregno line
- ACEI Bari-Matera line
- Milan M1
- Turin Metro, Italy
- Aarhus, light rail, Denmark
- Copenhagen Metro, Denmark
- Milan Metro, Italy
- LEB Lausanne, Switzerland
- Salerno Metro, Italy
- Metro Line SIR 2 Padua, Italy
- Line T2 Bergamo – Villa d’Almè, Italy
- T8 Tram Line Saint-Denis - Porte de Paris
- Milan - Limbiate suburban tramway, Italy
- Toulouse Metro Line B, France
- Emilia-Romagna lines, Italy
- Liberty Bridge, Mestre-Venice
- Electrification of the Belluno “loops”, Italy
- Monte Ceneri Base Tunnel, Switzerland
- Plovdiv-Burgas Line
- Suite Rapide 2018-2024, France
- Suite Rapide 2013–2017, France
- Rail Route 10, Lot 2 - Kosovo
- Rail Route 10, Lot 1 - Kosovo
- Sarajevo-Bradina Line, Bosnia
- Tangier-Marrakech line, Morocco
- Venice-Mestre Station
- Kosekoy-Gebze line, Turkey
- Ankara-Sincan High-Speed Line
- Rome-Naples High-Speed Line
- Padua-Mestre High-Speed Line
- Turin-Milan High-Speed Rail
- Bologna-Firenze High Speed line, Italy
- Brescia - Treviglio High-Speed Line
- TVE Sidi El Aidi - Marrakech
- Kenitra-Marrakech High-Speed Line
- Brescia-Verona High-Speed Line
- The new contact line for the Ponte della Libertà
- Electrification Veneto Basin: low ring
- Electrification Ferrovie Emilia Romagna
- Metro Cityringen, Copenhagen
- Aarhus LRT, Denmark
- Track renewal in "Suite Rapide"
- NRLA: Ceneri Base Tunnel
- GCF Media Gallery
- Photo Gallery
- Electrification of the Veneto Basin /9
- Electrification of the Veneto Basin /8
- Electrification of the Veneto Basin /7
- Electrification of the Veneto Basin /6
- Electrification of the Veneto Basin /5
- Electrification of the Veneto Basin /4
- Electrification of the Veneto Basin /3
- TE Venice - Mestre / 3
- TE Venice - Mestre / 2
- TE Venice - Mestre / 1
- Electrification Emilia Romagna
- Electrification of Veneto basin / 2
- NRLA: Ceneri tunnel
- Aarhus Light Rail
- Cityringen, photo gallery
- Electrification of Veneto basin / 1
- Railway workshop in Mestre
- Suite Rapide 2019, Lot 2
- Video Galleries
- FER, the Guastalla Substation
- FER, Budrio - Mezzolara Line
- GCF Video - FER, Ciano-Reggio
- FER, Tensioning of the Reggio Emilia-Ciano Line
- EBV - Data and Locations
- EBV - Tensioning of the Bridge over the Meschio (TL)
- EBV - Tensioning of the Bridge over the Meschio
- EBV - Tensioning towards Conegliano
- EBV - The Montebelluna Portals
- EBV - Equipment Installation at Alpago Station
- EBV - Tensioning at Vittorio Veneto Station
- EBV - Veneto Basin Electrification (XS)
- EBV - Veneto Basin Electrification (XL)
- GCF 2020, Corporate
- Monte Ceneri Base Tunnel
- Electric Traction
- TE Venice-Mestre, renewal works
- TE Venice-Mestre, the new portals
- TE Venice-Mestre, Phase 4 tensioning (HL)
- TE Venice-Mestre, Phase 3 equipment installation (TL)
- TE Venice-Mestre, Phase 2 portal installation (TL)
- TE Venice-Mestre, Phase 1 foundation casting (TL)
- TE Venice-Mestre, “in flight”
- Suite Rapide
- Mestre Railway Workshop
- GCF Mobi Turn
- GCF 2019, Electric Traction
- GCF 2019, Metro and Tram
- GCF 2019, Machinery Maintenance
- GCF 2019, Construction of new lines
- GCF 2019, Corporate
- GCF 2018. Railway Renewal
- GCF 2018, Electric Traction
- GCF 2018, Metro and Tram
- GCF 2018, Machinery Maintenance
- GCF 2018, Construction of new lines
- GCF 2018, EU Sites
- GCF 2018, Corporate
- GCF 2017. Renewal
- GCF 2017, Electric Traction
- GCF 2017, Metro and Tram
- GCF 2017, Construction of new lines
- GCF 2017, Corporate
- GCF 2016. Renewal
- GCF 2016, Corporate
- CMC Aarhus
- Cityringen Copenhagen
- Cityringen 7/7
- Cityringen 6/7
- Cityringen 5/7
- Cityringen 4/7
- Cityringen 3/7
- Cityringen 2/7
- Cityringen 1/7
- Golden sleeper block at Ceneri
- Recruitment
- Assistente Direttore Tecnico PAI-PL
- Direttore di Cantiere IS - Roma
- Tecnico CAD
- Tecnico Messa in Servizio Impianti PAI-PL
- BIM Manager – Railway Construction Company
- Ingegnere Ricerca e Sviluppo
- ASPP - Addetto Ufficio Sicurezza
- Tecnico IS
- Direttore Tecnico TE
- Progettista Senior Trazione Elettrica Sistemi Ferroviari
- Progettista Junior Trazione Elettrica Sistemi Ferroviari
- Project Engineer
- Progettista Sistemi di Telecomunicazione
- Progettista Segnalamento Ferroviario
- Planner
- Assistente Tecnico TE
- Assistente Tecnico IS
- Direttore di Cantiere TE
- Direttore di Cantiere IS
- Direttore Tecnico IS
- Assistente Tecnico jr PAI-PL
- Tecnico Messa in Servizio Impianti PAI-PL
- Tecnico Manutentore Impianti PAI-PL