Railway workshop in Mestre
Innovative solutions for the maintenance of high speed trains.
About 250 metres of raised track on posts for each of the 4 lanes. And a shed of 8,500 square metres fully set-up with an innovative removable rigid catenary. Fully illuminated by over 1,000 powerful led lights, the modern maintenance station conceived by GCF and intended for the maintenance of high-speed trains became operational in Mestre.
Inside the maintenance workshop built by GCF in Mestre
Switches, multi-voltage cabinets and sandpits for the external area
{ampz:ampzshortcode}
GCF Photo Galleries
- Electrification of the Veneto Basin /9
- Electrification of the Veneto Basin /8
- Electrification of the Veneto Basin /7
- Electrification of the Veneto Basin /6
- Electrification of the Veneto Basin /5
- Electrification of the Veneto Basin /4
- Electrification of the Veneto Basin /3
- Electrification Emilia Romagna
- Electrification of Veneto basin / 2
- Electrification of Veneto basin / 1
- TE Venice - Mestre / 1
- TE Venice - Mestre / 2
- TE Venice - Mestre / 3
- Suite Rapide 2019, Lot 2
- Railway workshop in Mestre
- Cityringen, photo gallery
- NRLA: Ceneri tunnel
- Aarhus Light Rail