Electrification Emilia Romagna

Electrification FER lines - Emilia Romagna
2021.09.20 First night of tensioning on Ciano d'Enza - Reggio Emilia.
In flight with the Drone at Suite Rapide’s French sites – Lot 2 where the powerful GCF’s Matisa P95 renewal train is in operative.
About 250 metres of raised track on posts for each of the 4 lanes. And a shed of 8,500 square metres fully set-up with an innovative removable rigid catenary. Fully illuminated by over 1,000 powerful led lights, the modern maintenance station conceived by GCF and intended for the maintenance of high-speed trains became operational in Mestre.